Our Story
Established in 2014, Kedar has been providing services to many of the key project sites through our vibrant and professional workforce. Kedar blends a dynamic experience and one-to-one support to integrate better work ethics and smarter engineering choices into the way people live and work.
1
Years Experience Working
Projects
Dubai Frame
Supply and installation of condensate drain tray for all AHUs (20 nos.) in Mezzanine floor & Viewing deck with necessary supports. Supply, installation & commissioning of control system to detect any leakage from AHUs and to raise an alarm to end users for necessary action. This includes supply & installation of required specialized sensors, cabling and control panels.
International City
Supply and installation of condensate drain tray for all AHUs (20 nos.) in Mezzanine floor & Viewing deck with necessary supports. Supply, installation & commissioning of control system to detect any leakage from AHUs and to raise an alarm to end users for necessary action. This includes supply & installation of required specialized sensors, cabling and control panels.
Caring & Maintenance of Storm water Lakes
Continuous caring & maintenance of stormwater lakes- 3 nos. in Nad Al Shiba by continuous treatment of water, cleaning, removal of any debris & floating algae by specialized dewatering equipment. Achieving the required & desired parameter of water quality.
Sh 2 & S. No.5 - Supply & installation of Solar street lights at Dubai Sports City
Installation of Solar Street lights within the time of 4 months by phase wise including removal of existing poles, excavation, supply & installation of battery chambers, foundations, assembling the poles with solar panels, controllers, lanterns etc., through necessary equipment including testing and commissioning for first time & 1 Time. IR inspection of landscape, civil, electrical and HSE phase wise is in progress.
Sh 2 & S. No.8 - Repair of Chillers in HCTA Hotel at Angola
Supply of necessary material required to repair the two chillers in HCTA Hotel at Angola. Carrying out the complete repair of chillers 2 nos. and testing & commissioning of these two chillers.
Caring Treatment & Maintenance of Al Layan Ponds at Al Qudra
Supply and installation of water treatment equipment including specialized DAF system, dosing unit, pumps. Maintenance of the Al Layan pond for a period of 5 years including continuous water treatment & maintenance of its equipment to achieve the required & desired parameter of water quality.
Sh 2 & S. No.3 - AC ducting in extract shaft at Dubiotech
Study of existing exhaust duct system, design, supply and installation of necessary ducting sheets to arrest the infiltration of ambient air in to the MEP shafts to prevent moisture formation on GI Bare exhaust ducts.
The Palm Jumeirah
Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.
Winter Camp
Supply and installation of 150W Flood light IP65, 6m conical pole- Hot Dip Galvanized, 36W LED 4feet tube light fittings, 18W LED Recessed down light, 63A new GRP enclosure DB with Foundation including all electrical connections and civil work.
JP, JVC, JVT & AF
Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.
Site A, B, C, D, DIAC-DOZ, IMPZ (Dubai Production City), DBT (Dubai Science Park), Villa Lantana & DSC
Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.
Testing & commissioning of VAVs & CAVs at Healthpoint Hospital
Carrying out Testing, adjusting and balancing of VAV/CAVs- 295 nos. with necessary testing equipment link capture hood, temperature measuring Device and Anemometers.
PJ Azure, Club Vista, JVC & JP
Maintenance of Solar Panels (Solar PV system & Solar streetlights), cleaning, regular inspection for damages and submission of monthly reports to the client for Nakheel Communities.
Refurbishment of HVAC system at DCL
Study of existing HVAC system, design, supply and installation of new Chillers, FAHUs, Chilled water pumps, ducting works, Electrical panels, cable laying to Achieve required temperature by client.
Replacement of FAHU Heat recovery wheels in Dubai Knowledge Park
Study of existing efficiency of FAHU Heat recovery wheels. Supply and replacement of FAHU Heat recovery wheels- 13 nos. with necessary cranage. Obtaining RTA Road diversion permits that are necessary for cranage. Alignment, testing & Commissioning of Heat recovery wheels.
Servicing of Fire dampers at BBET
Carrying out servicing of Fire dampers. Checking the manual and BMS operation of Fire dampers by activating the alarm. Replacement of damaged spare parts & Fire dampers.
Get in touch
with us
If you are not familiar with our company and your first contact with us is online, we will be pleased to hear from you. Please let us know what your needs and questions are, we will be more than happy to help.