Projects

Project Description

Operations & Maintenance of Street Lighting System at The Palm Jumeirah

Brief Scope of Work

Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.

Project Description

Additional AC condensate drainage works for AC units at Mezzanine floor & Viewing deck of Dubai Frame.

Brief scope of work

Supply and installation of condensate drain tray for all AHUs (20 nos.) in Mezzanine floor & Viewing deck with necessary supports. Supply, installation & commissioning of control system to detect any leakage from AHUs and to raise an alarm to end users for necessary action. This includes supply & installation of required specialized sensors, cabling and control panels.

Project Description

Chilled water pipe re-insulation work at Greens & Views.

Brief Scope of Work

Removal of existing & damaged chilled water pipe insulation. Supply and applying of Polyolefin elastomeric rubber insulation with necessary glue & tapes in 7 different buildings up to 10,000 mtrs of chilled water piping of different sizes with minimal shutdown & disturbance to residents.

Project Description

Operations & Maintenance of streetlights in JP, JVT, JVC & AF.

Brief Scope of Work

Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.

Project Description

Operations & Maintenance Service of solar light Poles at PJ Azure, Club Vista, Jumeirah Village Circle and Jumeirah Park.

Brief Scope of Work

Maintenance of Solar Panels (Solar PV system & Solar streetlights), cleaning, regular inspection for damages and submission of monthly reports to the client for Nakheel Communities.

Project Description

Refurbishment of HVAC system at Dubai central laboratory.

Brief Scope of Work

Study of existing HVAC system, design, supply and installation of new Chillers, FAHUs, Chilled water pumps, ducting works, Electrical panels, cable laying to Achieve required temperature by client.

Project Description

Replacement of FAHU Heat recovery wheels- 13 nos. in Dubai Knowledge Park.

Brief Scope of Work

Study of existing efficiency of FAHU Heat recovery wheels. Supply and replacement of FAHU Heat recovery wheels- 13 nos. with necessary cranage. Obtaining RTA Road diversion permits that are necessary for cranage. Alignment, testing & Commissioning of Heat recovery wheels.

Project Description

Three-year semi-comprehensive maintenance contract for the Solar PV system at DM Locations/ Facilities.

Brief Scope of Work

Maintenance of Solar PV systems (Solar on grid & off grid systems and Solar streetlights). Carrying out monthly cleaning of solar panels, servicing of batteries, inverters & controllers. There by ensuring the generation of solar on grid & off grid systems. Carrying out regular inspection for damages and replacing the same to ensure minimal breakdown period.

Project Description

Civil snag works at Al Wharf tower.

Brief Scope of Work

Carrying out rectification of Civil & MEP snags with all necessary material and Document submittals. Handing over the project to client for leasing.

Project Description

Repair of Chillers 2 & 4 at HCTA Hotel in Luanda, Angola.

Brief Scope of Work

Supply of necessary material required to repair the two chillers in HCTA Hotel at Angola. Carrying out the complete repair of chillers 2 nos. and testing & commissioning of these two chillers.

Brief Scope of Work

Supply and installation of condensate drain tray for all AHUs (20 nos.) in Mezzanine floor & Viewing deck with necessary supports. Supply, installation & commissioning of control system to detect any leakage from AHUs and to raise an alarm to end users for necessary action. This includes supply & installation of required specialized sensors, cabling and control panels.

Project Description

Caring & maintenance of Dubai Municipality stormwater lakes in Nad Al Shiba.

Brief Scope of Work

Continuous caring & maintenance of stormwater lakes- 3 nos. in Nad Al Shiba by continuous treatment of water, cleaning, removal of any debris & floating algae by specialized dewatering equipment. Achieving the required & desired parameter of water quality.

Project Description

Caring, treatment & maintenance of Al Layan Ponds at Al Qudra Road.

Brief Scope of Work

Supply and installation of water treatment equipment including specialized DAF system, dosing unit, pumps. Maintenance of the Al Layan pond for a period of 5 years including continuous water treatment & maintenance of its equipment to achieve the required & desired parameter of water quality.

Project Description

AC Ducting in extract shaft at Dubai Science Park building.

Brief Scope of Work

Study of existing exhaust duct system, design, supply and installation of necessary ducting sheets to arrest the infiltration of ambient air in to the MEP shafts to prevent moisture formation on GI Bare exhaust ducts.

Project Description

Supply and installation of solar streetlights at Dubai Sports City.

Brief Scope of Work

Installation of Solar Street lights within the time of 4 months by phase wise including removal of existing poles, excavation, supply & installation of battery chambers, foundations, assembling the poles with solar panels, controllers, lanterns etc., through necessary equipment including testing and commissioning for first time & 1 Time. IR inspection of landscape, civil, electrical and HSE phase wise is in progress.

Project Description

Ducting works for 8 nos. Package Units @ Traditional Souq.

Brief Scope of Work

Study of existing package unit ducts, design, supply and replacement of Ducting And installation of Aluminium cladding. Providing necessary ventilation to package Units by designing, supply and installing ventilation fans with ducting.

Project Description

Operations & Maintenance of Street Lighting System at Site A, B, C, D, DIAC-DOZ, IMPZ (Dubai Production City), DBT (Dubai Science Park), Villa Lantana & DSC.

Brief Scope of Work

Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.

Project Description

Testing & commissioning of VAV/CAVs at Health Point Hospital.

Brief Scope of Work

Carrying out Testing, adjusting and balancing of VAV/CAVs- 295 nos. with necessary testing equipment link capture hood, temperature measuring Device and Anemometers.

Project Description

Electrical works @ Winter Camp.

Brief Scope of Work

Supply and installation of 150W Flood light IP65, 6m conical pole- Hot Dip Galvanized, 36W LED 4feet tube light fittings, 18W LED Recessed down light, 63A new GRP enclosure DB with Foundation including all electrical connections and civil work.

Project Description

Servicing of Fire dampers in 14 buildings at Business Bay Executive Towers.

Brief Scope of Work

Carrying out servicing of Fire dampers. Checking the manual and BMS operation of Fire dampers by activating the alarm. Replacement of damaged spare parts & Fire dampers.

Project Description

Repair & maintenance of AC units in Falcon centre.

Brief Scope of Work

Study of existing HVAC system and design of new HVAC system to meet the desired space temperature. Supply & installation of AHUs, Ducting, Chilled water Piping, Chilled water valve package etc., Carrying out chilled water flushing, air balancing & chilled water balancing including testing & commissioning.

Project Description

Operations & Maintenance of Street Lighting System at The Palm Jumeirah

Brief Scope of Work

Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.

Project Description

Additional AC condensate drainage works for AC units at Mezzanine floor & Viewing deck of Dubai Frame.

Brief scope of work

Supply and installation of condensate drain tray for all AHUs (20 nos.) in Mezzanine floor & Viewing deck with necessary supports. Supply, installation & commissioning of control system to detect any leakage from AHUs and to raise an alarm to end users for necessary action. This includes supply & installation of required specialized sensors, cabling and control panels.

Project Description

Chilled water pipe re-insulation work at Greens & Views.

Brief Scope of Work

Removal of existing & damaged chilled water pipe insulation. Supply and applying of Polyolefin elastomeric rubber insulation with necessary glue & tapes in 7 different buildings up to 10,000 mtrs of chilled water piping of different sizes with minimal shutdown & disturbance to residents.

Project Description

Operations & Maintenance of streetlights in JP, JVT, JVC & AF.

Brief Scope of Work

Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.

Project Description

Operations & Maintenance Service of solar light Poles at PJ Azure, Club Vista, Jumeirah Village Circle and Jumeirah Park.

Brief Scope of Work

Maintenance of Solar Panels (Solar PV system & Solar streetlights), cleaning, regular inspection for damages and submission of monthly reports to the client for Nakheel Communities.

Project Description

Refurbishment of HVAC system at Dubai central laboratory.

Brief Scope of Work

Study of existing HVAC system, design, supply and installation of new Chillers, FAHUs, Chilled water pumps, ducting works, Electrical panels, cable laying to Achieve required temperature by client.

Project Description

Replacement of FAHU Heat recovery wheels- 13 nos. in Dubai Knowledge Park.

Brief Scope of Work

Study of existing efficiency of FAHU Heat recovery wheels. Supply and replacement of FAHU Heat recovery wheels- 13 nos. with necessary cranage. Obtaining RTA Road diversion permits that are necessary for cranage. Alignment, testing & Commissioning of Heat recovery wheels.

Project Description

Three-year semi-comprehensive maintenance contract for the Solar PV system at DM Locations/ Facilities.

Brief Scope of Work

Maintenance of Solar PV systems (Solar on grid & off grid systems and Solar streetlights). Carrying out monthly cleaning of solar panels, servicing of batteries, inverters & controllers. There by ensuring the generation of solar on grid & off grid systems. Carrying out regular inspection for damages and replacing the same to ensure minimal breakdown period.

Project Description

Civil snag works at Al Wharf tower.

Brief Scope of Work

Carrying out rectification of Civil & MEP snags with all necessary material and Document submittals. Handing over the project to client for leasing.

Project Description

Repair of Chillers 2 & 4 at HCTA Hotel in Luanda, Angola.

Brief Scope of Work

Supply of necessary material required to repair the two chillers in HCTA Hotel at Angola. Carrying out the complete repair of chillers 2 nos. and testing & commissioning of these two chillers.

Brief Scope of Work

Supply and installation of condensate drain tray for all AHUs (20 nos.) in Mezzanine floor & Viewing deck with necessary supports. Supply, installation & commissioning of control system to detect any leakage from AHUs and to raise an alarm to end users for necessary action. This includes supply & installation of required specialized sensors, cabling and control panels.

Project Description

Caring & maintenance of Dubai Municipality stormwater lakes in Nad Al Shiba.

Brief Scope of Work

Continuous caring & maintenance of stormwater lakes- 3 nos. in Nad Al Shiba by continuous treatment of water, cleaning, removal of any debris & floating algae by specialized dewatering equipment. Achieving the required & desired parameter of water quality.

Project Description

Caring, treatment & maintenance of Al Layan Ponds at Al Qudra Road.

Brief Scope of Work

Supply and installation of water treatment equipment including specialized DAF system, dosing unit, pumps. Maintenance of the Al Layan pond for a period of 5 years including continuous water treatment & maintenance of its equipment to achieve the required & desired parameter of water quality.

Project Description

AC Ducting in extract shaft at Dubai Science Park building.

Brief Scope of Work

Study of existing exhaust duct system, design, supply and installation of necessary ducting sheets to arrest the infiltration of ambient air in to the MEP shafts to prevent moisture formation on GI Bare exhaust ducts.

Project Description

Supply and installation of solar streetlights at Dubai Sports City.

Brief Scope of Work

Installation of Solar Street lights within the time of 4 months by phase wise including removal of existing poles, excavation, supply & installation of battery chambers, foundations, assembling the poles with solar panels, controllers, lanterns etc., through necessary equipment including testing and commissioning for first time & 1 Time. IR inspection of landscape, civil, electrical and HSE phase wise is in progress.

Project Description

Ducting works for 8 nos. Package Units @ Traditional Souq.

Brief Scope of Work

Study of existing package unit ducts, design, supply and replacement of Ducting And installation of Aluminium cladding. Providing necessary ventilation to package Units by designing, supply and installing ventilation fans with ducting.

Project Description

Operations & Maintenance of Street Lighting System at Site A, B, C, D, DIAC-DOZ, IMPZ (Dubai Production City), DBT (Dubai Science Park), Villa Lantana & DSC.

Brief Scope of Work

Routine inspection, attending emergency call requests, Reactive maintenance based on inspection, Preventive maintenance tasks, predictive maintenance suggestions, solutions for better performance and to increase the life span of assets.

Project Description

Testing & commissioning of VAV/CAVs at Health Point Hospital.

Brief Scope of Work

Carrying out Testing, adjusting and balancing of VAV/CAVs- 295 nos. with necessary testing equipment link capture hood, temperature measuring Device and Anemometers.

Project Description

Electrical works @ Winter Camp.

Brief Scope of Work

Supply and installation of 150W Flood light IP65, 6m conical pole- Hot Dip Galvanized, 36W LED 4feet tube light fittings, 18W LED Recessed down light, 63A new GRP enclosure DB with Foundation including all electrical connections and civil work.

Project Description

Servicing of Fire dampers in 14 buildings at Business Bay Executive Towers.

Brief Scope of Work

Carrying out servicing of Fire dampers. Checking the manual and BMS operation of Fire dampers by activating the alarm. Replacement of damaged spare parts & Fire dampers.

Project Description

Repair & maintenance of AC units in Falcon centre.

Brief Scope of Work

Study of existing HVAC system and design of new HVAC system to meet the desired space temperature. Supply & installation of AHUs, Ducting, Chilled water Piping, Chilled water valve package etc., Carrying out chilled water flushing, air balancing & chilled water balancing including testing & commissioning.